The show must go on! The stage management desk controls everything to do with the performance at the venues in the Sydney Opera House in both the front and back of house. The six existing units were well past their use by date and needed to be replaced with a state of the art design to serve for the next 20 years.
Winner of the 2012 Melbourne Design Award for best business and technology product, Charlwood’s solution is a flexible and functional desk that houses all the control equipment and interfaces within a beautiful and ergonomically designed console.